How Much #57 Gravel Do I Need?

🪨
#57 Crushed Stone
Approx. 3/4 inch angular aggregate • 1.5 tons/cubic yard
📊 Your #57 Gravel Estimate
⚖️
#57 Gravel Needed
📦
Volume
📐
Coverage Area
💰
Estimated Cost
Project Type: Driveway
Area:
Depth:
Volume:
Weight (Tons):
Weight (Lbs):
Weight (Kg):
Material Density: 1.50 tons/cu yd
Price: $40 / ton
400 sq ft × 6" depth ÷ 27 × 1.50 = 11.1 tons

Coverage estimates for #57 gravel at your selected depth:

Coverage per Ton:
Total Project Area:
Total Tons Needed:

What Is #57 Gravel?

#57 gravel (also called #57 stone, 57 stone, or 3/4 inch crushed stone) is the most commonly used construction aggregate in the United States. It's a clean, angular, crushed stone that measures approximately 3/4 inch in size — making it the workhorse of construction and landscaping projects.

🪨

Crushed Stone

#57 gravel is mechanically crushed from limestone, granite, or trap rock, producing angular pieces that lock together for superior stability and compaction.

📏

Approximately 3/4 Inch

Stones pass through a 1.5-inch sieve but are retained on a #4 sieve, giving a consistent 3/4 inch size that's large enough for drainage yet small enough to work with.

🔺

Angular Aggregate

The angular, fractured surfaces interlock tightly when compacted, creating a stable, load-bearing surface that resists shifting and rutting under heavy loads.

💧

Clean (No Fines)

#57 gravel is washed and screened to remove dust and fine particles, leaving about 40% void space for superior drainage — critical for French drains and under-slab applications.

Whether you're building a driveway, installing a French drain, creating a shed foundation, or preparing a concrete base, the #57 gravel calculator above helps you estimate exactly how much material you need. The #57 stone calculator uses standard construction formulas to convert your project dimensions into tons, cubic yards, and cost — no guesswork required.

How Much Area Does One Ton of #57 Gravel Cover?

Coverage depends on depth. Use this reference chart to estimate how many tons you'll need for your project:

DepthCoverage per Ton (sq ft)Coverage per Cubic Yard (sq ft)Typical Project
2 inches100 – 120 sq ft150 – 180 sq ftLight landscaping, decorative paths
3 inches65 – 80 sq ft100 – 120 sq ftGarden beds, walkway surface
4 inches50 – 60 sq ft75 – 90 sq ftShed foundation, patio base
6 inches35 – 40 sq ft50 – 60 sq ftDriveway base, parking pad
8 inches25 – 30 sq ft38 – 45 sq ftHeavy-duty driveway, drainage bed
12 inches17 – 20 sq ft25 – 30 sq ftFrench drain surround
* Coverage estimates based on #57 gravel density of 1.5 tons/cubic yard (approximately 2,700–3,000 lbs per cubic yard). Actual coverage varies by compaction, moisture content, and source rock type.

#57 Gravel Weight Conversion

Quick reference for converting between common units of #57 gravel:

AmountWeight (lbs)Weight (tons)Weight (kg)
1 cubic yard2,700 – 3,000 lbs1.35 – 1.50 tons1,225 – 1,360 kg
1 ton2,000 lbs1.00 tons907 kg
5 tons10,000 lbs5.00 tons4,536 kg
10 tons20,000 lbs10.00 tons9,072 kg
1 cubic foot100 – 111 lbs0.05 – 0.056 tons45 – 50 kg
1 truckload (~15 cu yd)40,500 – 45,000 lbs20.25 – 22.50 tons18,370 – 20,410 kg
💡 Quick Conversion Formula: Cubic Yards × 1.5 = Tons | Tons ÷ 1.5 = Cubic Yards | Tons × 2,000 = Pounds | Cubic Yards × 2,850 = Pounds (approximate)

Best Uses For #57 Gravel

#57 gravel is versatile — here are its four most common applications and why it excels in each:

🚗

Driveways

Recommended depth: 4-6 inches

  • Excellent compaction under vehicle weight
  • Angular stones lock together — no rutting
  • Superior drainage prevents puddling
  • Use as base layer under finer surface gravel

Typical 20'×20' driveway: ~11 tons ($330–550)

💧

French Drains

Recommended depth: 6-12 inches

  • ~40% void space maximizes water flow
  • Clean stone won't clog drainage pipe
  • 3/4" size ideal for surrounding perforated pipe
  • Wrap in landscape fabric to prevent soil infiltration

Typical 50' French drain: ~5-8 tons ($150–400)

🏠

Shed Foundations

Recommended depth: 4-6 inches

  • Creates a stable, level base
  • Prevents wood floor from touching ground
  • Excellent drainage under structure
  • Compacts to a solid platform

Typical 10'×12' shed base: ~2.5 tons ($75–125)

🏗️

Concrete Base

Recommended depth: 4-6 inches

  • Strong aggregate layer under slabs
  • Prevents concrete cracking from ground movement
  • Provides uniform load distribution
  • Standard sub-base for foundations and patios

Typical 20'×20' slab base: ~9 tons ($270–450)

#57 Gravel vs Other Gravel Types

How does #57 gravel compare to other common aggregates? Here's a side-by-side comparison to help you choose the right material:

MaterialTypical SizeDensity (tons/cu yd)Best UseDrainage
#57 Gravel3/4 inch1.5Driveways, drainage, construction basesExcellent
Pea Gravel1/4 inch1.3Decorative landscaping, garden pathsGood
Crusher RunMixed (dust to 3/4")1.6Compacted base layer, driveway surfacePoor
River Rock1 – 3 inches1.4Decoration, dry creek beds, bordersGood
#89 Stone3/8 inch1.5Driveway surface layer, concrete mixVery Good
#4 Stone1.5 – 2 inches1.45Erosion control, heavy drainageExcellent
🪨 Key Distinction: #57 vs Crusher Run: #57 gravel is clean (no fine particles), making it ideal for drainage. Crusher run (also called crush and run) contains stone dust and fine particles that fill the voids, creating a harder, more compacted surface but with poor drainage. Use #57 for drainage projects and base layers; use crusher run for driveway surfaces where you want a tight, hard-packed finish.

How To Calculate #57 Gravel Needed — Step by Step

Our calculator handles everything automatically, but here's the manual process so you understand the math:

1

Measure Your Project Area

For rectangular areas: measure length × width in feet. For circular areas: measure the diameter. For irregular shapes, break the area into smaller rectangles, calculate each, then add them together. A typical two-car driveway is about 20 ft × 20 ft = 400 sq ft.

2

Choose the Right Depth

Convert inches to feet by dividing by 12. Recommended depths: driveway = 4-6" (0.33-0.5 ft), French drain = 6-12" (0.5-1 ft), shed base = 4-6" (0.33-0.5 ft), landscaping = 2-4" (0.17-0.33 ft). Example: 6 inches ÷ 12 = 0.5 feet.

3

Calculate Volume in Cubic Yards

Area (sq ft) × Depth (ft) ÷ 27 = Cubic Yards. Example: 400 sq ft × 0.5 ft ÷ 27 = 7.41 cubic yards. This is the total volume of #57 gravel needed for your project.

4

Convert to Tons

Cubic Yards × 1.5 = Tons. Example: 7.41 cu yd × 1.5 = 11.1 tons of #57 gravel. Always add 10-15% extra (bring total to ~12-13 tons) to account for compaction, settling, and irregular grade. For large projects, round up to the nearest half-ton for delivery purposes.

Tons = (Length × Width × Depth in feet) ÷ 27 × 1.5
For circular areas: Tons = (π × Radius² × Depth in feet) ÷ 27 × 1.5
Density: #57 gravel = 1.5 tons/cubic yard (standard) | 1.35-1.50 tons/cubic yard (actual range)

Quick Calculation Examples

ProjectDimensionsDepthCubic YardsTons (#57 Stone)
Small Driveway20' × 20'6"7.411.1
French Drain50' × 1'12"1.852.8
Shed Base10' × 12'5"1.852.8
Parking Pad12' × 25'6"5.568.3
Concrete Base30' × 30'4"11.116.7

#57 Gravel Cost Guide

Understanding #57 gravel pricing helps you budget accurately. Here's what to expect:

QuantityPrice per TonTotal CostNotes
Bagged (50 lb bags)$160 – $280$4 – $7 per bagRetail pricing. Only cost-effective for projects under 0.5 ton
Small Load (1-5 tons)$30 – $50$30 – $250Minimum delivery fees usually apply
Medium Load (5-15 tons)$25 – $40$125 – $600Typical for a driveway or large landscaping project
Bulk Load (15+ tons)$20 – $35$300 – $700+Best value. Common for commercial or large residential

📋 Factors Affecting #57 Gravel Price

  • Location: Prices vary significantly by region. Areas near quarries pay less; remote areas pay more for transportation.
  • Delivery Distance: $50–$150 per load depending on mileage from the quarry or supplier.
  • Quantity: Bulk discounts apply at 10+ tons. Full truckloads (20-22 tons) get the best per-ton rate.
  • Supplier Type: Direct from quarry is cheapest. Landscape supply yards add markup. Big-box retail is most expensive.
  • Source Rock: Limestone-based #57 is most common and affordable. Granite or trap rock #57 costs $5-10/ton more.

💰 Complete 20' × 20' Driveway Cost Breakdown

#57 Gravel Base (11 tons @ $35/ton)$385
Surface Gravel (#89 stone, 4 tons)$140
Landscape Fabric (400 sq ft)$60
Edging / Border Material$80 – $200
Delivery Fee$75 – $150
DIY Total Materials$740 – $935
Professional Installation$1,800 – $3,500
💡 Money-Saving Tip: For projects requiring 1+ ton of #57 gravel, always order bulk delivery rather than buying bags. Bagged gravel costs $160-280 per ton versus $20-50 per ton for bulk — that's a 5-8x markup. The delivery fee for bulk is typically less than the markup on just half a ton of bagged gravel.

Frequently Asked Questions About #57 Gravel

#57 gravel (also called #57 stone or 3/4 inch crushed stone) is a clean, angular construction aggregate made by mechanically crushing limestone, granite, or trap rock. The "#57" designation comes from ASTM and AASHTO standards — stones pass through a 1.5-inch sieve but are retained on a #4 sieve, giving a consistent size of approximately 3/4 inch. It contains no fine particles (dust or sand), which creates approximately 40% void space between stones — making it excellent for drainage applications. #57 gravel weighs about 1.5 tons per cubic yard and is the most widely used construction aggregate for driveways, French drains, shed foundations, and concrete sub-bases.

Use the formula: (Length × Width × Depth in feet) ÷ 27 × 1.5 = Tons of #57 gravel. For a 20' × 20' driveway at 6 inches deep: 400 × 0.5 ÷ 27 = 7.41 cubic yards × 1.5 = 11.1 tons. For a 10' × 12' shed base at 5 inches: 120 × 0.42 ÷ 27 = 1.85 cubic yards × 1.5 = 2.8 tons. Always add 10-15% extra for compaction, settling, and irregular grade. Use the free #57 gravel calculator above for your exact project dimensions.

One cubic yard of #57 gravel weighs approximately 2,700 to 3,000 pounds (1.35 to 1.5 tons). The exact weight varies by source rock: limestone #57 gravel weighs about 2,700 lbs/cu yd (1.35 tons), while granite-based #57 stone weighs closer to 3,000 lbs/cu yd (1.5 tons). Moisture content also affects weight — wet gravel can weigh 5-10% more. For most construction and landscaping calculations, use 1.5 tons per cubic yard as a safe, conservative estimate that accounts for moisture and stone variability.

For a #57 gravel driveway, the base layer should be 4-6 inches of compacted #57 stone. This base provides drainage and structural support. Top this with 2-3 inches of a smaller, tighter surface gravel like #89 stone or crusher run for a smoother driving surface. Total driveway depth should be 6-9 inches (base + surface). For light-use driveways, a single 6-inch layer of #57 gravel can work, but it will be rougher to drive on. Always compact each layer with a plate compactor or roller for best results.

Yes, #57 gravel is one of the best materials for drainage because it's clean (no fines) and has approximately 40% void space between stones, allowing water to flow freely. This makes it the standard choice for French drains, retaining wall backfill, dry wells, under-slab drainage layers, and septic drain fields. The 3/4 inch size is large enough to prevent clogging while small enough to be easily handled. For maximum drainage performance, always wrap #57 stone in non-woven geotextile fabric to prevent surrounding soil from infiltrating and filling the voids over time.

#57 gravel costs $20 to $50 per ton for bulk delivery, depending on location and quantity. Small loads (1-5 tons) cost $30-50/ton. Medium loads (5-15 tons) cost $25-40/ton. Bulk orders (15+ tons) can be as low as $20-35/ton. Bagged #57 gravel at home improvement stores costs $160-280 per ton (about $4-7 per 50 lb bag). Delivery fees add $50-150 depending on distance. A typical 20'×20' driveway requiring 11 tons costs about $385-660 for materials (bulk delivery) or $1,760-3,080 if buying bags — making bulk delivery dramatically more cost-effective.